9/20/2024: Over this past week I have worked on assembling the 3D printed gearbox, as well as the rest of the robot. I have run into a few issues with…
9/20/2024: Over this past week I have worked on assembling the 3D printed gearbox, as well as the rest of the robot. I have run into a few issues with…
Fall 2024 Start Project Update 1 (9/13/2024) To-do List Week 4 -Order 2-4 drive base motors-Start CAD for drive base motor brackets-Stress test drive base motor brackets-Calculate gear ratio for…
Week of 4/20 This week we presented at design expo. The judges seemed to enjoy the three projects that were there since the average rating was a 5.77 out of…
2024 Spring Week 14 Update Progress Things were really going this week! In short, for the first time Kewee Meters have real AC Voltage measurements, even when plugged into the…
Week of 9/17/2023 This week I have been looking into passive vs. active power factor correction (PFC) to learn which would be a more viable option for our project. Passive…
Restruder 9/17/2023 - 9/23/2023 Updates One of the issues from last semester that I wanted to improve is the diameter sensor for the Restruder. While looking at the previous diameter…
9/23/2023 Returned project to end state of Fall 2023.All members now have 24/7 access to the project via Teamviewer.Downloaded preloaded YOLO assets and weights for object detection.Ensured that code could…
9/22 This week the team visited the mine we will be working on (Mead Mine). While we were there, we were only able to walk around the outside. We were…
Week of November 11-17 2024 This week I made the final wiring diagram for the Husky-Clean. I also met with Nick to finalize the electrical system before our design check-off.…
Weekly update for 9/22This week has been quite busy with career fair and everything, hopefully next week is not as busy. Our team was able to meet with Shane and…