Joshua Frazier’s Work Log
Week of 3/17 This week, I tested the pressure sensor and got back the correct voltage outputs for given pressures. PID tuning is now in testing phase. This week, my…
Week of 3/17 This week, I tested the pressure sensor and got back the correct voltage outputs for given pressures. PID tuning is now in testing phase. This week, my…
Week 2 Research how current can be measured 2 ways: Older way: Shunt Resistor What is a shunt resistor how does it work why is it the older method Newer…
Jan 13th-17th Started Deer Dissuader research Thoughts on beginning deer dissuader project and project sketch: The week of the 19th was not incredibly productive, I got the lowdown on the…
Week of 9/9/24 . Project update 1. To Do list for the next week: Research everything since I am new and still need to learn about synthesizers MIDI compatibility and…
(9/13/2024) This week, I will be collaborating with my team to identify the necessary components for a dryer unit designed for the filament flip-flop system. This unit must function even…
OSHE (Deer Dissuader) Spring 2025: Project Update 9 (Mar. 30th) TO DO List Format Documentation for Deer Dissuader Create Instructions for recreating the project If necessary finish any requirements from…
(9/13/2024) This coming week I will be working on designing the general dryer unit for the filament flip-flop unit. This unit should work while the printer is off to ensure…
To Do : Discuss with BREAD the type of board we'll be using for the project. Determine the type of guide we should use for the filament in the rewind…
WEEK 4 - Project Update 3 Power sensing IC attached to breakout board Operational diagram PAST WEEK: Soldered the our system's primary IC, the power sensing module, to a breakout…
3/30/2025 Work Log Reflection on work since last log Did a lot of work on software side of rewinder bread integration can motor control infidel tuning Control loop software needs…