Joel Diccion’s Work Log
Work Log 1 (Week of 9/18/2023) Over the past week, we have successfully determined the initial sizing for our secondary circuit. The bulk of the work has been on the…
Work Log 1 (Week of 9/18/2023) Over the past week, we have successfully determined the initial sizing for our secondary circuit. The bulk of the work has been on the…