Jacob Tierney’s Work Log
Week 2: Reflection: As anticipated, the closed sourced software with no documentation blew up in our face when trying to connect to the LiDAR with the required engineering tools. This…
Week 2: Reflection: As anticipated, the closed sourced software with no documentation blew up in our face when trying to connect to the LiDAR with the required engineering tools. This…
Work Log 1 Find battery requirements and expected ranges, needs to be workable for a commuter to MTU Find costs of said builds and chart, keep in mind for being…
Week 7 Completed: CDR Happened Continued battery research Completed general research on chargers Started research on converters To Do: Continue research and choose battery, respective charger, and conversion method &…
SEMESTER 1 WEEK 3 To-Do List1. Collaborate with team and create a power point presentation for the project showcase at the next OSHE meeting. The powerpoint should be somewhat specific…
2/16/2025 Update Last week, we had CDR. As it turns out, analog is ridiculously hard to work on at scale compared to all digital. As a result of this, and…
SPRING 2025 WEEK 5 UPDATE - Project Update 4 Week 5 Reflection: Last week I had originally selected the BQ24072TRGTR IC for our battery management system. After a closer look…
Fall 2024 Project Update 1 (9/13/2024): Attached below is a sketch of what the Delay pedal that me and Xavier will be contributing to the pedalboard might look like. Currently,…
9/13/2024 The image above is my sketch of what I think the "IRL Subtitles" project will look like by the end of the semester. My goal this week to start…
Electric Viola Update 1 (09/13/2024) This is a quick sketch of what I imagine the design of the electric viola to look like as well as a todo list for the…
9/13/2024 To do List: Design a PCB for the mountable scanner. The PCB will replace the breadboard circuit that is currently powering the scanner. It will be done using KiCad,…