Andrew Kroll’s Worklog
TODO Assist with assembly Week 9 Finished CAD of box Week 8 Box model includes ridge, standoffs, and is fully parameterized Week 7 Basic CAD model of the box Week…
TODO Assist with assembly Week 9 Finished CAD of box Week 8 Box model includes ridge, standoffs, and is fully parameterized Week 7 Basic CAD model of the box Week…
03/30/2025 This week has been a lot of grinding trying to get everything to come together. We spent multiple hours over the curse of the weekend testing our code for…
Week 1 Helped create Project Specifications Familiarized myself with OSHE processes Did research on potential parts we would need to purchase Week 2 Briefly researched libraries to use with the…
New Member (Newb) About Me Projects ARMCade (Current Project)
Progress Update 9 3/30/2025 Progress PCB boards came in, components soldered Enclosure made Footswitches wired to board and tested To do Minor adjustments to enclosure Final testing and check off…
Week of 3/17 This week, I tested the pressure sensor and got back the correct voltage outputs for given pressures. PID tuning is now in testing phase. This week, my…
Week 2 Research how current can be measured 2 ways: Older way: Shunt Resistor What is a shunt resistor how does it work why is it the older method Newer…