Jacob Tierney’s Work Log
Week 2: Reflection: As anticipated, the closed sourced software with no documentation blew up in our face when trying to connect to the LiDAR with the required engineering tools. This…
Week 2: Reflection: As anticipated, the closed sourced software with no documentation blew up in our face when trying to connect to the LiDAR with the required engineering tools. This…
Work Log 1 Find battery requirements and expected ranges, needs to be workable for a commuter to MTU Find costs of said builds and chart, keep in mind for being…
Week 7 Completed: CDR Happened Continued battery research Completed general research on chargers Started research on converters To Do: Continue research and choose battery, respective charger, and conversion method &…
Lab Manager About Me Projects Open Source Thunniform Robot (OSTR)
SEMESTER 1 WEEK 3 To-Do List1. Collaborate with team and create a power point presentation for the project showcase at the next OSHE meeting. The powerpoint should be somewhat specific…
Lab Manager About Me Projects Filament Flip-Flop
3/23/2025 Update The PCB design is finalized, and I've got the PCB into FreeCAD. At the moment, my current task is to sketch out the outline of the board, as…