Alycia Greer’s Work Log

  • Post author:
  • Post last modified:November 13, 2025
  • Reading time:1 min read
  • Post category:Work Logs

November 10

Work Complete: We got a full check off and we have started on semester report.

To-Do List: OSHE-Reader Checkoff and Semester Report


November 3

Work Complete: Finish up PCB schematic designed of Display connector section and setting up the battery charging schematic.

To-Do List: PCB schematic designed of Display connector, Microcontroller, and ERC.


Octeber 27

Work Complete: Finish up Button PCB Schematic and started on Display connector section.

To-Do List: PCB schematic designed of SD card section, Display connector, Button section, Microcontroller, and ERC.


Octeber 20

Work Complete: Started Button PCB Schematic and Solder on pins

To-Do List: PCB schematic designed of SD card section, Display connector, Button section, Microcontroller, and ERC.