Tyler Blazoff Work Log Spring 2025

  • Post author:
  • Post last modified:March 24, 2025
  • Reading time:3 mins read
  • Post category:Uncategorized
Tyler Blazoff Work Log 1

Tyler Blazoff Work Log 3

Project Update 7

  • My own work was quite light this week for open mobility, Alex combined the parts of our previous KiCAD schematics to be made into a PCB, so I focused more on other OSHE things this week, like volunteering and fulfilling my outreach requirements. I also participated in a brief brainstorming session for my group’s social media post.
    • This next week I’ll likely be breadboarding our circuit together depending on when parts get here to make sure our PCB would work as intended.
    • I’ll also likely solidify our social media post a little more
    • Possibly start working on final presentation?
  • Next week will be rough as far as time goes but I’ll have to make due with tuesday and Friday, I’m getting lifeguard certified through the class which only runs through the week. Not very OSHE related but just reduces my bandwidth greatly

Project Update 8

  • Met with group about going forward plans
  • Met in person Saturday morning to solder IC as well as find possible backups in case of the worst
  • “Aided” Alex in breadboarding but that would be generous

TODO

  • Meet in lab tuesday morning and continue work on physical circuit
  • Continue with group on ideas for board integration
  • Try to get some deliverables ready to present, make easy for Shane