Brady Johnston’s Work Log

  • Post author:
  • Post last modified:September 13, 2024
  • Reading time:2 mins read
  • Post category:Work Logs

WEEK 3

To-Do List
1. Collaborate with team and create a power point presentation for the project showcase at the next OSHE meeting.

  •  The powerpoint should be somewhat specific to what we want to accomplish over this semester.

2. Meet with team to decide form factor of FFF prototype.

  •  This will go hand-in-hand with the powerpoint when it comes to generating the specifics of what the project should look like this semester.

3. Start testing with octoprint and a spare ender 3 that I have.

4. Do more research on other MMU’s to draw inspiration from.

Concerns

1. I am mildly concerned that I will not be as helpful to the team as I would like to be.

2. That our team will be able to develop feasible plan of attack for the FFF project.

3. That we will have enough time in the semester to accomplish what we want.