Wesley Barron’s Work Log

  • Post author:
  • Post last modified:September 11, 2024
  • Reading time:3 mins read
  • Post category:Work Logs

Week 1 (8/26 – 8/30)

  • Joined the enterprise!
  • Reviewed all associated materials for the Husky Clean project
  • Set up necessary items on website for the semester
  • Met with team members to establish a meeting time and project details
  • Went through miscellaneous parts to be used for the upcoming project
  • Briefly toured the lab to see what equipment is available for use

Week 2 (9/2 – 9/6)

  • Met with team to create project spec for the semester
  • Went over assigned tasks
  • In Albuquerque 9/4 – 9/7 due to grad school conference

Week 3 (9/9 – 9/13)

To-do list for the coming week:

  • Begin full CAD model for the Shop Vac
    • Create vacuum body, bladder, and LiDAR in assembly
  • Determine what version of ROS will be used on the Pi
  • Assist in creating a specific Gantt Chart track to build progress
  • Figure out how battery, electronics, and water systems will route around the robot

(Please pardon my terrible drawing)

Possible Concerns

  • Layout, parts, and functionality are still way too vague
    • Still need to figure out the battery, motors, and bladder system
  • Workload distribution may be a bit uneven – still hard to tell at the moment