Eric Riebe’s Work Log
Multi-FX Pedal Project Update 4 (2/16/2025) This past week a lot of my time was devoted to working on my CDR slides along with presenting at CDR. In addition to…
Multi-FX Pedal Project Update 4 (2/16/2025) This past week a lot of my time was devoted to working on my CDR slides along with presenting at CDR. In addition to…
Lab Coordinator About Me Projects Multi-FX PedalKeWee Energy Meter