(9/13/2024) This week, I will be collaborating with my team to identify the necessary components for a dryer unit designed for the filament flip-flop system. This unit must function even when the printer is off to maintain the filament’s quality and prevent any printing issues. Additionally, I will be researching the best methods to protect the filament from environmental factors to ensure optimal performance.
Goal: Design and plan the general dryer unit for the filament flip-flop system.
- Research: Investigate dryer units, environmental factors, and best practices for filament storage.
- Component Selection: List necessary components, research suppliers, and compare options.
- Design: Create a detailed design that works even when the printer is off and plan integration.
- Team Collaboration: Meet with the team, assign tasks, and set deadlines.
- Documentation: Document findings, prepare a report, and update the project timeline.
Concerns for the Next Week:
- Component Availability: Ensuring components are available and can be soured in time.
- Design Challenges: Designing a unit that operates independently off the printer.
- Team Coordination: Effective communication with the team with updates and jobs.
- Time Management: Balancing this project with other assignments and meeting with the team when we don’t have much time to do so already.
(9/22/2024) This past week, our team successfully completed our presentation slides, detailing our project and execution plans. We collaborated effectively, brainstorming ideas for the materials list and identifying what we need to order to begin construction. We also finalized concepts for the finished design and purchased some materials for the base structure. Items to add to the to-do list include initiating the build and acquiring the correct parts. On the other hand, assigning jobs can be removed from the list as it is no longer necessary.
Goal: Develop and outline the overall dryer unit for the filament flip-flop system.
- Analysis: Explore dryer units, environmental factors, and optimal practices for filament storage.
- Evaluation: Identify required components, research suppliers, and compare available options.
- Integration Planning: Develop a detailed design that functions even when the printer is off and plan for seamless integration.
- Scheduling: Convene with the team to set deadlines and ensure smooth coordination.
- Reporting: Record findings, compile a comprehensive report, and update the project timeline accordingly.
Concerns for the Next Week:
- Sourcing: Ensuring all components are available and can be soured in a timely manner.
- Independence: Creating a unit that operates independently of the printer.
- Communication: Maintaining effective communication with the team and providing updates.
- Scheduling: Balancing this project with other assignments and coordinating team meetings despite limited time.
- Project Initiation: Ensuring the project starts on time.
(9/29/2024) This week was pretty busy with the career fair, so we didn’t get as much done as we hoped. We decided to switch from Fusion 360 to Onshape for CAD because the free Fusion 360 licenses don’t support an editable shared folder for the team. We started a shared drive for CAD files and ordered some more parts, but we’re still waiting for them to arrive—hopefully today or tomorrow—so we can finish a rough CAD of the dryer before our CDR. Some of the team has been working on an adjustable holder for the rolls, inspired by DIN rails, and plan to make a mostly 3D printable rail with mountable bearings for the roll’s walls. Once the parts come in, we can measure them and create the unit to scale with precise features on Onshape. I’ll be focusing on the dryer unit in Onshape, and as a team, we’ll be preparing slides for the CDR and figuring out the best way to handle the switching unit in our next meeting.